Utilization of virtual reality

IN DESIGNING A NEW WORKPLACE OF ASSEMBLY OF 1ST BRAKE

“Our company needed to invest in technological change due to the increasing complexity of our production. However, we would not have been able to achieve this without the Digital Factory tools. We were able to decide for the best solution using dynamic simulation and verification of solution designs in a virtual reality environment. It was one of several investments in our plant and we are glad that we were able to achieve the expected goal in a short time and within the given space.“

JURAJ HUDAC, CEO, TATRAVAGONKA, A.S.

//CLIENT: TATRAVAGONKA, A.S.

//FOCUS: Manufacture of freight train wagon and bogies

//PLACE OF IMPLEMENTATION: TATRAVAGONKA, a.s. Poprad, Slovakia

TATRAVAGONKA, a. s. is a Poprad-based company focused on the manufacture of railway wagons with an average annual production of around 4,000 freight wagons and 10,000 bogies. However, the company is also engaged in the production of welded structures for passenger wagons.

tatravagonka_logo_ceit
EFFICIENT ONSET OF PRODUCTION OF COMPONENTS IN NEWLY-DESIGNED ASSEMBLY WORKPLACES
cs_tatravagonka_ceit

PROJECT OBJECTIVE – SOLUTION PRIOR TO IMPLEMENTATION

Streamlining assembly processes and investing in new technologies due to the increasing complexity of wagon manufacture. Designing a solution in the Digital Factory environment with the help of dynamic simulation, all of that prior to starting the actual implementation of the project.

STEPS TAKEN AND PROJECT OUTCOMES

// Proposal of variants of the 1st brake assembly layout with a detailed design of individual elements of the workplace and taking into account the principles of ergonomics.

// Proposal of several variants of assembly activities cycle setup for individual operators taking into account individual limitations and overlapping times.

// Verification of the proposed versions of assigning activities to operators was carried out directly at the company‘s workplace after the implementation of the design.

// Definition of a complete list of workplace equipment.

// Recalculations and evaluation of legislative requirements for manual handling of loads.

// Identification of waste and bottlenecks.

// Proposal of a logistics route for supply. Supermarket design to pick material for assembly workplaces in accordance with the lean logistics principles.

BENEFITS OF THE PROPOSAL

// Effective onset of the component manufacture at newly-designed assembly workplaces

// Floor space saving in relation to the removal of unnecessary elements of workplaces

// Consideration of the principles of ergonomics already in the process of workplace design

// Elimination of waste in connection with unnecessary moves within the workplace

// Design of new assembly workplaces with verification of capacity and space requirements in the Digital Factory environment prior to the actual implementation phase

// Detection of possible collision states in a detailed variant

OUTPUTS ALSO IN VIRTUAL REALITY

The proposal/design of the final production layout was preceded by a series of workshops with the Tatravagonka team, where virtual reality was used for a better idea of the designs during the implementation of the project and subsequently also during the final presentation of the output.

Tatravagonka_CEIT_CS
Tatravagonka2_CEIT_CS
Designing in a Digital Factory environment allows you to shorten the onset time of a new system.

//REDUCTION OF THE DESIGN TIME IN THE DIGITAL ENVIRONMENT BY 15 %

//INCREASE OF THE PERFORMANCE OF ASSEMBLY WORKPLACES BY UP TO 30 %

//SHORTENING THE CYCLE TIME OF THE PAINT SHOP LINE FROM 45 TO 30 MIN

//ADAPTATION OF THE DESIGN TO SEQUENTIAL MATERIAL DELIVERY

//PROJECT DURATION 3 MONTHS